A temporary bridge has been erected to replace the one that was washed away by massive floods at Chapel Adamstown on Christmas Day.
Heavy rainfall caused extensive damage to the bridge on the R735 between Adamstown and the N30 which lead to a closure of the route. A temporary crossing has been established before the main works take place and news on the reopening of the road to traffic is expected before the end of the week. Back to news Follow South East Radio on: Facebook – Instagram – Twitter – Linkedin
Funeral Details for the Late Fr. Odhrán Furlong Announced
Urgent Search Appeal Launched for Missing 44-year-old Clonroche Man
Ireland Reads 2026 In Wexford Library
North Wexford TD To Meet With Minister Troy To Discuss Flood Insurance